Project Control Academy Reviews

Project Control Academy Reviews

 

Testimonials for Applied Project Control Training Program

Karim Kaba
Project Controls Manager, Canada

Applied Project Control training is the best training program that I have seen for the project controls industry. I believe this is very valuable for individuals who are entering the in project control arena and project controllers who would like to further their understanding of planning and cost control.

Mohd Jasim, PSP
EPC Planner & Coordinator, United Kingdom

Applied Project Control training is one of the best courses I have ever done on Project Controls, which covers all aspects in-depth, and I am sure this will help me to perform better on my job hereafter.

Arturo “Art” M. Tactay
Senior EPC Project Manager, California, USA

We would like to thank you very much for a very good Project Controls Essentials Training. It’s very refreshing and interesting, and really thought us a lot to review and implement more the value of planning ahead using better WBS, schedule & cost on our projects, and involving our teams more during this process.

And most importantly, making us realize again the true meaning and value of learning and appreciating the PV, AC, EV, BAC, CV, SV, SPI, CPI, EAC, ETC, VAC methodologies & calculations to use it even more in our project controls, monitoring and forecasting.

Not that we don’t know of and use these before, but now, after these sessions from you, we tend to realize and appreciate better the true importance and value of these methodologies and process which can really help us in all of our project controls, monitoring and forecasting processes moving forward. Thank you very much for a job well done!

Rajesh Kandanala, M.Sc., PMP
Project Controls, Canada

In my 15 years of experience in Project Controls, I came across various training books and tools but nothing compares to Project Control Academy’s training videos. It is very clear, concise and packs a ton of information in its 7 modules. It takes years to understand and master the concepts of project control; however, Shohreh has done a great job in presenting these complex concepts in easy to understand the step-by-step process. This is probably the most accurate and fastest way to become a “Project Control Professional

Feria Vaziri
Planning Engineer, Australia

After 10 years of experience in Improvement Projects, Project Controls, Shutdowns, Constructions, commissioning and cost planning, I still could find lots of valuable planning concepts and tools in the Applied Project Controls training. This training is an integrated package that could answer lots of the questions which I face in my practical experience. I could pick up helpful tips and tools form this program. I’m very happy with the systematic approach that is used in this step by step package. I recommend this training to all Planners and users in every level of work experience as this training proved to be so useful for users in all levels of expertise. Thank- you so much for developing this valuable package

Daniel Ruiz Navas
Project Control Clerk, Colombia

I was a complete newbie on project controls and now I feel that I understand a lot of what is going on in my work place. Thank you for the opportunity of taking this course

Ken Clevenger
Document Controls Manager, USA

Project Control Academy consistently delivers “best in class” training material and content derived from experience and delivered passionately by someone who really cares about you and your future.

Clement Suhendra
Senior Project Control Specialist, Qatar

The Applied Project Control training course was harder than I expected and also compared to other PMP courses I have gone through. It raised the bar! Definitely worth going through it…thank you for the opportunity given to go through this course

James Sanderson
Manager, Project Control at Waste Management, USA

The Applied Project Control training was a very effective course. Content and delivery were of excellent quality. I feel my team has been given the knowledge to launch our program to the next level

Pamela DeGraaf
Project Services Manager

Stantec Consulting took the Applied Project Controls in-house training course for the following reasons:

• To provide a stepping stone for the junior and intermediate staff to discover the various components of Project Controls and how all the pieces work together.
• To bring the different disciplines together to provide a common ground, speak the same language.

On both those fronts the course did just that.

Dr. Sami Fahmy
CEO of Performance Excellence Institute International, Former President of PMI NAC , Canada

The Applied Project Control course is well designed, skillfully illustrated and presented. The simple yet colorful and creative slides enhance the students’ learning ability and aid in understanding and memorizing it. The examples used are simple yet practical and easy to understand. The explanation of the course material is very good. Overall the course is excellent, compared to other courses I have seen, I find it much higher quality than many. I enjoyed the modules I reviewed.

Default Avatar125
Karen Cooper
Outage Controller

As my position is Outage/ Project Controller, I would classify the Applied Project Controls course as being very effective in my role. The quality is very high and it applies to all aspects of my role.

Douglas Williams

Wow!!! That was more material than we covered in a 16-week masters level PM course at a Top 10 engineering school.

It is the best training I have ever done in my entire life and professional career. Applied Project Control Training met and went above my perspectives in a very positive way. I could understand all the steps explained clearly in details step by step.

This training opened my mind and will help me to see and apply improvements in my professional role as Planning Engineer. Thank you!

Oladele Adeneye

The Applied Project Controls course is great. It flows from infancy to adolescence in project controls.

Christian Padilla

The Applied Project Controls course is great. Now I have the confidence for project control roles. Thanks.

The course was informative, valuable and well presented. I took the course as part of self- development. Thank you very much.

This was a very informative and valuable course. I have already begun to implement many of the skills learned in by workplace and will continue to propose more efficient ways to project controls processes.

Default Avatar125
AbdiganiMohamed Aden

I am very happy I have taken this course of applied project controls. It is an interesting subject and a wonderful course. Thanks a lot.

Default Avatar125
Bryan Jackson

Great course! Very valuable training and information that should pay for itself in the first project it is utilized on. Thank you!

Scott Porter
Enjoyed the Project Control Summit

Although I didn’t get a chance to listen to all the presenters throughout all four days, I tried to check out as much as I could in between meetings. I enjoyed listening to the interesting topics being discussed each day. There were two speakers in particular that caught my eye – Chris Carson and Walter Lipke. I thoroughly enjoyed listening to Chris Carson and the group he put together on the last day of the conference. I wish they could have had more time to speak. I learned a great deal from this presentation.

I am looking forward to next years Project Control Summit.

Thank you,

Scott Porter

Maris Balodis
PCS 2021

Thanks for the work you did put into organizing this event.
I will go through all recordings in near future and from what I have seen already, the money was well spent.
Thing considers for improvement:
1) workshop in schedule development, claim showing in the schedule, the main thing to check to develop a reliable schedule
2) Job affairs, where participants can share if their companies have open vacancies.

Project Control Summit

The summit was perfect, it was well organized and lots of information shared.

 

Testimonials for the Essentials of Earned Value Management Training Program

Jay Oberholster
Senior Quantity Surveyor, Mozambique

The quality of the Essentials of Earned Value Management course is BRILLIANT! As a result of this training, I will make other people (fellow employees) aware of the problems we are currently facing and explain how it can possibly be rectified.

Gareth Kourie
Senior Contracts Administrator, Qatar

The course was exceptionally well presented and designed. Very impressive. I give it 10 out of 10. As a result of the training, I will be applying the knowledge and tool to projects I am involved in.

Richard Miesemer
IT Program Manager USA

The course is very comprehensive and presented in a “building-block “style that made comprehension easier.

Imran Abdul Rasheed Mabubasha
Sr Project Controls Engineer, Qatar

The quality and course content is excellent. Contents are precise and state the point. Provides the fundamental ideas to start deep dive into Earned Value Method. As a result of this training, I will try to implement the earned Value Analysis on projects (deep dive) working and in future

Default Avatar125
Jacques Wilken
Commercial Manager, South Africa

The Essentials of Earned Value Management course is very robust, detailed, and very user friendly. I will implement the course on the project and apply the relevant content filter down to team members in PC.

Default Avatar125
Magdy Meshriky
Senior Project Controls, Canada

I had the pleasure to enroll in this course, for Project Controls Experts. I see this course as one of the best interactive courses for EVM, which is more practical and competent than others out there. Everything is very well presented. Moreover, It’s useful and necessary for EVM knowledge development. It was really exciting going through these learning modules, which address daily Project Controls work. I would recommend this course to all my Colleagues.

Roberto Orlandi
Regional Project Controls Manager, Australia

Smart, extremely clear journey into EVM and good project practice in general (from the proposal right up to the close out). Valuable tool both for learning and putting order to notions collected in our professional experiences

Nonhlanhla Khoza
Quantity Surveyor, Mozambique

As a cost control quantity surveyor, this course has been informative and very much upgrading. I am enlightened to many aspects of cost reporting and cost analysis. I am enlightened about the relationships within the project team. As a result of the training, I will apply the gained knowledge on all reports I will be doing in future. I will also engage myself with all the members of the project team as they have useful information for the project.

Ashley Deegan
Quantity Surveyor, Qatar

Good presentation of the content that covered sufficient detail around each topic to give a holistic understanding. I am going to try to build on this knowledge and kick on to try and get prepared for the PMI exam.

Padraig Leahy
Quantity Surveyor, Australia

Detail was very in-depth. Clearly explaining the necessary steps to apply EVM on a project.

Default Avatar125
Denis O’Shea
Quantity Surveyor, Qatar

The course was very good and enjoyable. A lot of detail covered, in descriptive and very well explained. As a result of this training, I will try to push the implementation of EVM on my daily projects and assist with detailed reports to management.

Default Avatar125
Adam Britten
Manager, Dubai

Personally I felt the EVM training was superb and very well structured/delivered, we all learned a lot from this, thank you

Sandile Sibiya
Quantity Surveyor, South Africa

The Essentials of Earned Value Management course is highly effective. The content is relevant to the work that we do. I am pleased with the quality of the course and find it to be of a high standard.

Eman Daoud
Project Control Engineer, United Arab Emirates

Very comprehensive. Excellent course & materials. I absolutely enjoyed every bit of it. As a result of this training, I will reflect EVM on all projects that I am assigned to.

Trevor MacMaster
Director Oil & Gas International

What I liked most about the Earned Value Project Management course was:
• Demystified Earned Value Management and made it relative to project life cycle.
• Good flow to course

Default Avatar125
Naumi Yin
Technical Analyst

Earned Value Project Management course brought me better understanding and implementation in depth and details.

Default Avatar125
Brandy Duncan

I have found the Essentials of EVM training be very informative and educational. I have come away with a more in-depth understanding of EVM and how it is utilized in a project. This course has improved my knowledge and skills.

Very insightful and interactive. Presentations were interesting, good slides and videos that kept us all engaged. A real eye-opener for us all! Thank you.

The course is very well structured, easy to understand explanations and very well guided, which is not an easy task.

The Essentials of EVM training is an amazing course, very well organized and very well explained. A JEWEL for project controls professionals.Congratulations for a great course, material and support! Your contribution is valuable. All the best to Project Control Academy.

Default Avatar125
Lucky Enajite Edjenekpo

Splendid and very succinct information shared in this training. Every part of the training is valuable due to the relevance to complete understanding of how EVM works in real life project. I enjoyed the course.

Voraphan (gail) Chonnapasatid

I found the course useful since it provides very thorough fundamental knowledge which can be applied to a real project. The exercise was simple yet tested the understanding of the content learned from the course.Overall great class.

Default Avatar125
Justin Case

The effectiveness and quality of the course was great. I learned a great deal about Earned Value Management. The part that I found most valuable was Performance Measurement and Cost & Schedule Forecasting. These modules give you the tools required to accurately report on your project and shows how to look for potential issues.

Default Avatar125
Darius Espiritu

The Essentials of EVM training is a comprehensive and high-quality online training course. All parts of the courses are integrated, and the flow of discussion is great. Thank you sooo much!!!

 

Testimonials for the EVM Mastery Training Program

Marco Neves
Project Controls Director

I had the opportunity to participate in the Mastering EVM for Project Success course. No doubt, it was the best Project Control course that I’ve participated in my career. I’ve learned a lot and I believe it will be perfect for professional development. I would recommend this course to all Project Control team members.

Roxana Taimuri
Cost Controller, Canada

Course content and quality was both very effective to providing knowledge about EVM and more importantly providing clarity and direction on situations and how to apply the methodology. Job well done. Material & content was very comprehensive. As a result of this training I will have more cooperation/ interaction with scheduling and document control teams, implement and use more EVM methodology for project analysis.

TJ Craddock
Commercial Coordinator, South Africa

I found the training very valuable as we can implement this knowledge in all projects in order to increase the success rate of our projects. I am going to add a higher level of EVM to the projects and show the Project Manager it is really needed.

Ryan Mudliar
Project Controls Manager, South Africa

Well organized, excellent layout and content, and very relevant to applied project situations. I found all applied EVM case studies very valuable. As a result of this training, I will incorporate EVM practice in projects I am involved in.

Default Avatar125
Paul Jordan
Senior Quantity Surveyor, Australia

The course was very effective in demonstrating the importance of establishing a robust reporting system to analyze project status.

Sandile Sibiya
Quantity Surveyor, South Africa

Highly effective. It is broad, in-depth, and very detailed. I will endeavor to become an EVP after this training.

Melvin Govender
Quantity Surveyor, South Africa

The content was well structured with valuable examples and case studies which helped understand the various sectors of EVM . I found the case studies to be most efficient. I would like to recommend the implementation of EVM on future projects as much as possible.

I really liked the EVM Mastery training. My knowledge of earned value management now is much more robust. The examples and exercises are very useful and some of them challenging. We went step by step applying the essentials of EVM in this Mastery class. As a result of this training, I am planning on pursing the Earned Value Professional (EVP) designation from AACEi.

Default Avatar125
Lucky EnajiteEdjenekpo

The EVM Mastery course content is rich, hands-on oriented, and delivered very effectively.I found all the parts of the training very valuable because they are packed full with concrete information that is useful for immediately implementation in real life project, through the case study exercises.
The EVM Mastery course content is rich, hands-on oriented, and delivered very effectively. I found all the parts of the training very valuable because they are packed full with concrete information that is useful for immediate implementation in real-life projects, through the case study exercises.

Since the implementation of EVM is uncommon in my country, it is my intention to continue to advocate the adoption of EVM as best practice for project controls.

Thank you very much for providing this training – Mastery of Earned Value Management.

 

Testimonials for the Project Scheduling Blueprint Training Program

Jacqueline Pacheco
Cost Controller / Junior Scheduler/Planner, Canada

Project Scheduling Blueprint is a great way to breakdown developing a schedule. The course helped me really understand the CPM concept and how to read and analyze a schedule.

Luz Sadama-Reed
Information Management, Canada

This course is presented in such a way that even a non-planner understands the material.

Default Avatar125
Elaine Saxby
Document Control and Quality Systems Manager, Canada

I found the Project Scheduling Blueprint training extremely helpful. It provides a great awareness to the details of the scheduling process.

Anél Hugo
Project Controls Manager

I have already been able to add further value to our Project by simplifying how we will run our next Risk Workshop – by using the Risk Impact Window (the Management Team loved the simplicity, yet super powerful nature of it). So, thank you for providing great tools like that.

 

Testimonials for the Forensic Schedule Delay Analysis Training Program

Ahmed Al-Shaer
Planning Manager

It was not easy decision to go with the course from multi offered courses for delay analysis from different organizations.

Two main factors were the driving for me to go with this course:

1st one is that the instructor is Mr. Chris Carson who has a very long experience in this subject, in addition, Mr. Chris is developing many publications for AACE International related to delay analysis & scheduling.

The 2nd factor is this course aligned with AACEI’s Recommended Practice 29R-03 which rarely to find it with other similar courses.

I’m really excited from the experience I gained from this course especially with two case studies applied through Claims Triage Techniq

James Tompkins

Excellent expert knowledge and practical solutions. Well taught and documented. Highly recommended

Vijayarengan Chockalingam
Manager Project Control & Contracts

Good opportunity to learn this Forensic Schedule Delay Analysis course, an absolute fulfillment on AACE’s RP 29R-03 studies. Literally, we have been pre-occupied for a period of time during this travel with Chris Carson, amazing and great professional experience.

Significant eye opener on know how about the methodologies, like to remember “knowledge can not be given, it has to be taken”, perhaps we have been given by Mr.Chris and like to thank Shohreh as well for this learning opportunity to study, implement and practice. The claim triage technique is really awesome.

Like to add an acknowledge, to whom you are real thirst to learn about delay analysis and this is the best opportunity to indulge with and to move forward.

Default Avatar125
Harold Heckel

I learned far more than I had anticipated from this course and it will take a long time and much re-reading to absorb all the material that was presented. Excellent Course!! Well worth the cost. Thanks again Chris and Shohreh

Hans du Toit
Costing and Planning Manager, South Africa

Forensic Schedule Analysis is a fairly new concept in the broader South African environment with not many experts to rub shoulders with. Despite my searches locally, and internationally, I did not find any hands-on training or mentoring in this environment.

Thankfully I came across AACE International whom had published the recommended practice for Forensic Schedule Analysis (RP 29R-03). However I, like many others, had to struggle through the RP by myself in an attempt to master the concepts . I must say that the RP was very intimidating to me and I found it difficult to truly grasp the concepts.

Great was my excitement when I noticed that this course was going to be presented by a person whom has not only participated in formulating the RP, but whom I have come to respect based on his involvement in just about every sphere of Project Controls and specifically Forensic Schedule Analysis.

I may have learned a little late in my life that, if you want to become the best you can at what you do, you have to invest in yourself. I had a difficult decision as, given the ROE, this course was going to cost me a fair amount of South African Rands that I would have to fork out of my own pocket.

Today I can say with confidence that it was money well spent for not only has Chris opened my eyes to properly understand the RP but he has shared intricate knowledge and experience that any other course will find hard to match. Chris shares some of the best advice and personally developed tricks that are jaw dropping.

I must also say that the platform and the delivery method of this course really made me realise that classroom training is not necessarily a key requirement to be able to engage with the tutor. There is ample opportunity to engage through on-line questions and Chris has been very thorough in his responses. Despite the odd technical glitch, as is to be expected when one relies on internet service providers, I commend Shohreh and the Project Control Academy team on a very pleasurable learning experience.

Having done this course I am not yet a Forensic Schedule Analysis expert, but it has put me on course to become such an expert, if I will continue to yield to the expert guidance Chris has provided in this training.
 

 

Bruce GreeSon
Senior Project Scheduler, USA

I recommend this course to clients, contractors, and those who want to learn more about delay analyses to enhance your knowledge, career, or to become an expert in the forensic schedule delay analysis. Prior to this course, the best way to learn delay analysis was to work directly for an attorney, and or a contracts manager, or from a consulting firm with a staff attorney specializing in claims

Trish Pulver
Senior Project Analyst, USA

Excellent Forensic Schedule Delay Analysis class. It was very comprehensive and covered a wide array of topics. The icing on the cake throughout the entire class was Chris Carson sharing lessons learned from his 40+ year career. Thank you!

Rafael Socarrás

The information provided in the course sets the principles for analyzing delays and its causation in accordance with good engineering practices (AACE® International Recommended Practice No. 29R‐03). I highly appreciate all lessons and knowledge shared by Chris Carson and the great coordination of the sessions made by Shohreh Ghorbani. This training is a great contribution for the construction community. Highly suggested.

Syed Elli
Lead Planning Engineer, Qatar

I would like to thank Shohreh and especially Chris Carson for conducting such a knowledgeable and myth clearing course. I am happy that I am part of this endeavor. The first thing is that in 95% cases a person won’t find this course or even a similar course on the Internet and getting something from a mentor and authority like Chris is my luck and admiration for him. As a professional working in the field, I must say that this course clear many myths for me and that makes this course very important for advanced level students or knowledge seekers. The most mesmerizing of all was the Expert Witness session. At the end the cost-benefit ratio for this course is 100%, it’s a must do training for all the Planners, Cost Professionals, Claim Personals, Delay Analysts etc.

Gajendiran Govindaswamy
Senior Planning Engineer, Dubai

I have 20+ years experience with the Main Contractor and now for 2+ years with the Lead Consultant, specifically in Dubai and Saudi Arabia, with the majority of my experience in Programming, Scheduling and Delay Analysis reports.

I see this course is really useful and has got lots of insights which the Planners should certainly learn. After reading the contents of the course materials, I’m able to improve my thinking process in analyzing the delays, and particularly the selection of right methodology of ‘delay analysis’ for the given circumstances.

THANK YOU one and all for this very valuable course, which filled in the gaps in my knowledge and clarified various doubts I had in ‘forensic schedule delay analysis’.

All the very best to the team…

Husni Madi
Founder

Frankly, I was very hesitant to register for this course. The reason was that I am already a Forensic Schedule Delay Analyst with some good experience and cases under my belt, where I feared that this course will not add much to me.

Nevertheless, what encouraged me to register is that this course is delivered by Chris Carson, a thought leader in the industry and one of the drafters of AACE’s RP 29R-03.

After taking the course, I can confidently say that my fears were completely unfounded and I have extremely benefited from this course beyond what I have imagined.

Not only he shared his vast knowledge and know how on the subject, but Chris was extremely generous in sharing lessons learned from his 40+ years of experience. coupled with Shohreh’s support and a second to none platform this course, in my opinion, is the best in the market. I cannot over emphasis the value for money of this course.

Shohreh and Chris, I cannot thank you enough for this splendid course and for what you are doing for the industry.

Maria C. Alvarado Herrera
Project Control Specialist, Netherlands

This Forensic Delay Analysis course has been an enriching experience, a training process that has added a great earned value to my professional development.

The structure of the course, based on the AACEI’s Recommended Practice 29R-03 has been perfect, covering all the subjects of this practice and clarifying any possible doubts that the participant may have.

The facilitator, Mr. Chris Carson is excellent with a vast experience in the subject; every word he has said during the course is pure knowledge. His explanations are clear and concise; the material annexed to each module enriches and solidifies the content of the course even more.

The online classes allow students to participate and interact directly with Mr. Chris Carson; and also remarkable that having an excellent platform with the possibility of accessing the videos at any time and from anywhere is a huge advantage for people like me who have limited time and to whom the time difference does not allow us to participate in the live sessions.

It has been a pleasant experience and I recommend it 100%.

Ferdinand Ancheta

Excellent Training! It was inspirational, motivating, innovating, brought best ideas and in-depth knowledge together with case studies! I would recommend this training course to anyone in the field of project planning/scheduling/project controls.

Ernesto Montales
Director / Project Planning & Project Controls Consultant

I was looking to enhance my knowledge of Delay Analysis for some time now but I didn’t find anything offered in the market now worth taking until I came across Project Controls Academy offering a free Webinar on Forensic Schedule Delay Analysis by Chris Carson. I have known Chris for quite some time now, I always follow his recorded webinar on Planning & Scheduling and had the pleasure of meeting him personally at the Planning Planet event in London many years back.

When I learned he is doing a full course on Forensic Schedule Delay Analysis, and plus a good offer from Project Controls Academy I didn’t hesitate to enroll, and I can say this was my best online training so far! Chris gave a very detailed explanation on the topics on a very deep manner not just on the academic side of this but his 40’s of experience which I can say can’t be found on any training course. It opened my eyes on AACE’s RP 29R-03, which is the must-have reference. The course is truly value for money!

I also would like to acknowledge Shohreh for her encouragement and outstanding support, 24/7. Whenever I have some issues she’s is always there happy to help, even on weekends.

Shohreh and Chris, words cannot express enough my gratitude, and I look forward to applying what I have learned in my current and future projects.

Steve Paterson

Being a seasoned professional I have indirectly known the facilitator Mr. Chris Carson for a good number of years and was delighted to sign-up for the Forensic Schedule Delay Analysis course having missed the opportunity the first time around.

I embarked on the course to broaden my knowledge on the forensics side of the schedule, as I’m an independent consultant that regularly reviews Contractor and Sub-contractor schedules in the Oil and Gas Industry. The course was an in-depth look at the AACEi’s RP and how the Claims Triage Workshop assists in selecting the correct methodology for a particular case. I found it very interesting and followed with ease.

Many thanks for pulling together such an interesting course and I look forward to putting what I learned to good use very soon.

Ahmed Fouad Abdulhamid

One of the best courses I had ever attended in my practical life, it gathers all of the professional experience and secrets of planning career in a set of sessions, where I never imagined that there is a course that contains such a lot of valuable priceless information that resembles real-life cases and problems in planning career.

I participated recently in two delay claims where my company hired a large consulting agency in the USA for doing the job that was done using the same steps mentioned in the course.

I will definitely recommend this course to my company to be taken by all lead planners and for me sure will take again every period of time to keep this information fresh in mind.

Manoj Pradhan

Being a member of AACE International, I had prior access to the RP 29R-03, but it is through this course, that I got a fairly good insight into the Forensic Schedule Delay Analysis concept.

Major take away of the course is the Claim Triage concept & knowledge shared by Chris Carson form his enriching experiences.

Marina Chernova

Very professional.
I liked information presented logically and shortly, with lots of useful tips and examples.
Provided articles for each session help to crystalize understanding of the subject.
The room for improvement can be in providing full reports as examples for popular methods if it’s not confidential.
Thank you very much

Sean Vermaak
Planning Manager, South Africa

Firstly I want to applaud Project Control Academy for providing such a high standard training course.Thank you Shohreh.
Then to Chris, for sharing your many, many years of experience and knowledge so willingly and also providing us with some very invaluable tools. The course was intense, challenging but very rewarding. It was an honor to be taught and tutored by one of the industry best. This course has provided me with the ability now to diligently tackle analysis in a structured manner and by applying what I have learnt on this course will be able to do this with confidence.

Jurie Du Toit

The amount of knowledge held by Chris inspires me. I feel privileged to have had the opportunity to learn from his experience. I was amazed over the world of schedule analysis that I have not been exposed to yet. This course has given me the footing to be prepared when my career reaches that point. It is significant since you cannot prepared for something you cannot foresee. Thank you Chris and Shohreh for contributing to the project control fraternity.

Clement Suhendra

This course exposes me to the structure on how Forensic Schedule Delay Analysis is being practiced by the experts. Content is relevant and material is challenging! Course is designed and presented in a professional way! Worth the investment! I learned a lot of new things. Presenter is a SME on the subject. Looking forward crossing with his path in the future. Thank you, Shohreh! Thank you, Chris!

This is my third course with PCA using the LMS, and I’m one satisfied client! Keep up the good work!

Murad Najafov

Excellent Course with lost of useful information. Thanks to organizers.

Nils Hanfstingl

Really enjoyed the course. If there is ever an updated live course I might even join again. Thank you very much, it did really give me lots of new approaches !

I can recommend this course to everyone involved in the delay analysis world regardless of the experience already made.

Mustafa Ozgoren
Forensic Delay Analyst, Claims Consultant

Chris shares his deep knowledge and extensive experience in this course. I feel very lucky and happy that I was able to take this course and ask my questions to a thought leader. I am surprised with the quality of information and the rich course content which definitely exceeded my expectation. I believe even the experienced planners/delay analysts will find a lot to learn from this course and I recommend this training for every forensic planner.

Omer Muharremoglu

It has been one of the best training I have received. It was so unique as the instructor shared his real-life experiences and cases which was were some of the factors that made the course priceless. I enjoyed and benefited from every minute of the course. From the first week of the course, I started using the knowledge I gained from the course. It will be an good asset for me through my carrier by providing me a good foundation for forensic planning and a broad perspective in evaluating and managing the schedules in my future projects.
I appreciate all the efforts and valuable sharings of Mr. Carson and special thanks to Ms. Ghorbani for delivering this unique and valuable learning opportunity to us.

Beatrice N

What an amazing journey this has been!

Listening to Chris Carson going through the Forensic Schedule Analysis RP while also sharing so generously his lifetime experience was uplifting.

The course is very well paced, and the complimentary material shared by Chris is extremely relevant. The effort put in preparing and delivering the course is palpable and the detail of his answers to the numerous questions raised by the participants is beyond expectations.

A course highly recommended not only for Claims specialists, but also for any Project Controls professionals committed to preventing schedule-related claims.

Default Avatar125
Ammar EL AMMAR

The Forensic Schedule Analysis Course by Mr. Chris Carson was very helpful in better understanding the basics and applications of the Recommended Practice. Mr. Carson’s wide experience and knowledge of the topic proved invaluable throughout this course.

The course was an eye-opener on some issues I missed in past claims and I do believe the learnings from this course will add great value to my claims in the future.

Many thanks to Chris and the Project Controls Academy team and colleagues and all the best in the future.

The BEST of all other courses that I undertook so far on the Forensic Schedule Analysis subject. It has been a fantastic learning experience from one of the best world-class practitioners on the subject. Actually, it has had a great impact on my usual view on ‘Observational’ methods as I always regarded retrospective TIA (MIP 3.7) as ‘THE optimum method’ until I started getting deeper learning in this course particularly of MIP 3.4 and 3.3. The claims-triage sessions were the most attractive for me next to step-by-step learning of all nine MIPs. Thank you for this excellent course.

Default Avatar125
Mohamed Abdelaziz

I would like to extend a big THANK YOU for offering this course. You did made our lives (scheduling and project controls professionals) far easier and gave us hope that the forensic schedule analysis is not black magic:) You laid out a process for us to follow, supplied adequate specific material and this is something that I am grateful for and I am sure other project controls professionals feel the same way.

Sessions were developed and arranged in very natural way to give knowhow and practical knowledge of that high value and complex topic of forensic delay analysis from A-Z.
Sessions were developed and arranged in very natural way to give knowhow and practical knowledge of that high value and complex topic of forensic delay analysis from A-Z.

The course is very detailed and practical. Personally, I have learnt a lot from this course and have already started applying concepts learnt successfully in my day-to-day work.

I believe every word said by Chris is Gold dust. Would admit it took a lot of time and commitment to complete the training, however, it’s worth all the time and money spent.

Quantitively speaking very easily the value gain from the course is at least ten times more for me the money and time spent.

Amazing course, lot of new things to learn, wealth of experience and knowledge shared. Very well designed. Already started implementation of techniques and templates learned during this course in our reports. I believe the BESTtraining in the market. Thank you.

It is extensive, technically well designed, fastidiously picked and uploaded articles -belong to top professors and practitioner in construction and project management area. Shared experience and deep knowledge of the instructor collected over decades! It is my personnel opinion that this course should be equivalent to 30 credit points in a master’s degree in Project Management area.

Many many thanks to Project Control Academy team is for providing this course for us. Many many thanks to Chris Carson for his effort, for his purpose, and sharing his knowledge and experience with us.

Many thanks to the entire team at Project Control Academy, and especially Chris and Shohreh for developing and offering an Excellent training program on Forensic Schedule Analysis.

The content and presentation of this course was TOP NOTCH, and I consider it just about the BEST education I’ve received in decades!

From the first couple of sessions, I began applying the knowledge and lessons learned in my role as a construction manager for an AE/CEI firm. Now that I’ve completed the course, I feel like I’m on a new and exciting career trajectory that I’ve been wanting for years.

Thanks to Chris and Shohreh, I feel empowered with a knowledge base that I can continue to build on and really contribute to the world of FSA. I just can’t thank you both enough. I look forward to more Project Controls courses.

Default Avatar125
Kumara Ganesan

Its great experience to know in-depth knowledge of FSA methods and its practical implementation techniques. In current role(am not delay expert), while analyzing prospective variation/delay claims by contractors, I would be extensively using few claim triage techniques and as well be going to be able to better review schedules for owners and manage schedules for contractors. Thank you for this great course.

I wish to express my gratitude for sharing your expertise and experience in this course. Even though Project controls and Analysis is a fairly “new” and equivocal field for construction projects in most countries, having the backing of this most informative and educationally supportive environment and training has given me the confidence to be able to further implement a greater understanding for the necessity for Project Control implementations and the confidence in providing a strong and stout analytical result for such requirements. This has also further broadened my opportunities to include sound and tested methodologies, for both, “on-the-job” and “post-job” analysis.

Default Avatar125
Gordon Ralph

There has been a significant effort spent on the course preparation and delivery and I believe it is one of the BEST INVESTMENTS that I have made into online tuition.
There has been a significant effort spent on the course preparation and delivery and I believe it is one of the BEST INVESTMENTS that I have made into online tuition.

The course has presented me with a number of benefits. The ‘cloak of confusion’ around the type of methodology to use and the multiple names of these methodology has been removed. The language in RP 29R-03 is clear, simple and easy to understand. Being a UK type of education and experience person, I have only been aware of the SCL DDL until now and it is very beneficial to me to see this RP.

In addition to the case study deliverables and workshop, the supporting documents that show the worked examples on each MIP allows one to clearly see and understand how these analyses are developed. Just the capacity to have retained and recorded all of these lessons is no mean feat. Thank you very much.

I would like to thank you for such tremendous efforts providing an in-depth learning journey in Delay Analysis field. Before I took this course, I didn’t have much understanding about FDA techniques or its practical implementations, as there are certain predefined methods used without a clear or structured approach on how to use them.
I would like to thank you for such tremendous efforts providing an in-depth learning journey in Delay Analysis field. Before I took this course, I didn’t have much understanding about FDA techniques or its practical implementations, as there are certain predefined methods used without a clear or structured approach on how to use them.

Thanks to the great explanations and expertise received from this course, I can say that I have a strong foundation to build on in my career in FDA, and to deal with claims with confidence as every word in this course was an added value to me, which I will keep adding on learning and reviewing its material to improve my skills in this challenging but interesting field.

During this training, my project control approach has been changed and evolved into a higher step. This training became a transformer and gear changer in my career.

Default Avatar125
Hassan Gaafar

Many thanks for this great course. The Course is of very high quality although it is an online course. It covers almost everything in delay analysis. Although I am not a delay analyst, at the end of the course, I found myself very knowledgeable about the delay analysis and its methodologies and I am able to argue with opposition delay analysts about the methodologies used for the analyses.

This is an extremely valuable course for any scheduler. Even if I have no plans to go into forensic scheduling, the information presented and explained in this course will absolutely help me with my planning and scheduling.
Having the processes explained and the expansion of their use from real cases really helped drive home the reasons for the processes/methodologies and helped me understand how they are actually implemented.

 

Testimonials for the Project Controls Success Roadmap Training

Irina Markova
Senior Cost Engineer, Azerbaijan

Ladder of success in Project Control” is very interesting video. Found it useful and even something new for myself working in project controls for several years. Thank you!

Leon Mzite
Quantity Surveyor, Mozambique

Good career guidance and encouraging message, you have enlightened a good pathway to follow. Thanks for the valuable info.

Default Avatar125
Connie Chung

Thank you for the presentations on different positions within the field of Project Control. It was very informative and helpful, knowing which roles play a part in a project

I really enjoyed the descriptions of each job/category in Project Controls. It was super helpful for me to figure out what best suites my skillset/personality.

Default Avatar125
Brandy Duncan

Very informative training course. I now have better understanding of the different roles of Project Controls and what it takes to be successful in each one. Some great advice and insight from the academy and from the expert interviews.

 

Testimonials for the EVM in P6 Training Program

Petyon Green
Project Scheduler

I just signed my official offer letter with *** Solutions … as a Project Scheduler to schedule capital projects. I want to thank you for giving me a game plan to have the confidence to hit the ground running when I get there using Earned Value in P6. I start on September 4th, and will be ready to go as soon as I arrive. My plan is to show them that I am not a Mutt right away and take the bull by the horns

Clarence Brown
Project Controls

What I learned with Advanced Planning Analytics has propelled me into deploying advance functions like Earned Value using Primavera. This is one of the best courses that I have taken. Definitely worth it.

Charlotte Weiss
CEO

This was worth the investment, as I paid for it personally for my own development. I’ve been planning for 15 years in EV specific programs as a consultant, and have had great success configuring EV in both Open Plan and Microsoft Project. With that said, during this training, I actually had just started working in a Primavera EV system. This will be my first opportunity to make EV work in Primavera for a $300M project. The lessons from this training will be invaluable!

Samantha McCulloch

Anyone who has prior experience in P6 & EVM can think it is a cakewalk, however, it is not, we need to pay close attention in P6 EVM settings. This course provides best recommended settings which is the positive outcome of the course.

Very informative, practical training on the use of EVM in P6.
An excellent instructor who was able to easily explain the course materiel and share his vast knowledge of the subject matter.

The course provided an excellent insight into another dimension of P6 for effective use of EVM.The quality was excellent, as it was based on a live example.
The course provided an excellent insight into another dimension of P6 for effective use of EVM.The quality was excellent, as it was based on a live example.

P6 setting with the checklist, the layouts, the global change functions and finally the bonus materials will be of immense help to me, as I will be using all those tools practically in my own professional work to add value to my work product.

Hats off to the instructor for his knowledge in P6 with all its intricacies.

Default Avatar125
Joel Cadiao

The course is very informative. I learned a lot.The most valuable part of this course for me is the complete EVM report template on how to represent that to the Client.
I’m excited to apply all the templates and techniques shared to my new project. I really enjoy this course.

The EVM in P6 course is very effective course. I learned a lot of new things, especially the logic behind some of the functions. I will begin to use the templates shared in the course and apply EVM in all projects whether the client requests for it or not.

The Course is very effective. It added new valuable information to me. The instructor is highly qualified in his specialty of EVM in P6. The overall feedback, I am impressed. Thank you.

Default Avatar125
David Williams

The EVM in P6 was a very effective course in that it allowed very much hands on user interaction and the quality was very good.

The parts of the training I found most valuable was in the case studies. It gave me an opportunity to practice real life situations that I could relate to in the process.

Default Avatar125
Jamie Batula

The Quality of the course was excellent. It was really nice to have all the content and see it applied in a real live project, then to work it on our own.

The instructor is very knowledgeable and very experienced. I have several practical things I have taken back to my work place already. Thank you.

Our Biggest Thanksgiving Sale Is ON! Save Up to 60% on Project Controls Training Programs & Packages.

Close Welcome Bar