Resource leveling in Primavera P6 sounds straightforward in theory, until you actually try to do it.
Many schedulers know the frustration all too well. You build the logic correctly, load resources, finalize durations, and feel confident about the schedule—until you open the resource histogram and realize the plan is practically impossible to execute.
Crew demands spike unrealistically. Resources jump dramatically from week to week. Histograms look chaotic. Project managers start asking difficult questions. And the moment you attempt to run P6’s leveling function, your carefully planned finish date suddenly moves out by weeks—or even months.
So, what happens next?
Most schedulers either avoid resource leveling entirely, manually shift activities around hoping for improvement, or spend hours trying to fix the unintended consequences of leveling runs that disrupted the critical path and created even more confusion.
The reality is that resource leveling is one of the most misunderstood and underutilized capabilities inside Primavera P6—not because the tool itself is flawed, but because most professionals were never taught how to approach it properly.
This free live 90-min masterclass is designed to change that.
In this practical session, you’ll learn how to approach resource leveling with far more confidence, control, and understanding. Instead of guessing your way through leveling settings and hoping for acceptable results, you’ll learn how P6’s leveling engine actually works, how to make smarter leveling decisions, and how to create resource-loaded schedules that are not only technically correct—but realistically executable.
Led by Mostafa AbdelRazik, PMP, EVP, PSP, this session draws from years of real-world planning, scheduling, project controls, and construction experience across industrial, power, turnaround, and major capital projects.
Through live demonstrations and real scheduling scenarios, you’ll see how overloaded schedules can be leveled step-by-step while protecting project priorities and minimizing unnecessary impacts to project completion dates.
More importantly, you’ll begin to understand the reasoning behind the decisions—not just which buttons to click.
Whether you are a junior planner, scheduler, planner/scheduler, or project controls professional working with Primavera P6, this session will help you move beyond simply loading resources into P6 and toward genuinely managing them in a practical, defensible way.
In this free 90-minute masterclass, you will learn:
Resource leveling does not have to feel like trial and error.
Join us for this practical live session and learn how to turn resource-loaded schedules into plans your project teams can actually execute—with more confidence, clarity, and control.
WARNING:
We have limited number of virtual seats available on our webcast system and space will fill up fast, so register now to avoid missing out.
Mostafa AbdelRazik is a project controls professional, Primavera P6 practitioner, and instructor with strong hands-on experience in planning, scheduling, resource management, progress reporting, earned value, productivity analysis, and data visualization.
He is a certified Project Management Professional (PMP), Earned Value Professional (EVP), and Planning & Scheduling Professional (PSP), and has supported complex industrial, power, infrastructure, turnaround, and major capital projects. His work includes developing and updating schedules, facilitating planning sessions with project teams, analyzing schedule quality, creating automated reporting tools, and building Power BI dashboards linked to Primavera P6 data.
Mostafa is also an instructor at NAIT (Northern Alberta Institute of Technology), where he teaches Construction Scheduling, Cost Control, Construction Productivity, and Project Management. In addition, he serves as an instructor with Project Control Academy, teaching the Practical Project Scheduling with Primavera P6 course and helping professionals strengthen their real-world scheduling capabilities. He is also a regular speaker at AACE International, PMI, and Project Controls Summit events.
To learn more about Mostafa, please visit his profile on LinkedIn.
Shohreh Ghorbani is the Founder and Technical Director of Project Control Academy, a global education platform dedicated to helping project professionals develop practical, job-ready project controls skills.
With more than two decades of experience in project controls, Shohreh brings deep industry knowledge and a strong understanding of what professionals need to succeed in real project environments. Her early background as an Industrial Engineer in manufacturing and quality systems shaped her strong focus on data, process discipline, continuous improvement, and practical execution.
Her own transition into project controls without formal training became the driving force behind her mission: to make project controls education clearer, more practical, and more accessible for professionals around the world.
Since founding Project Control Academy in 2012, Shohreh has helped serve tens of thousands of professionals globally through practical training programs, webinars, expert interviews, and Project Control Summit. She is the creator of several flagship programs, including Applied Project Controls, Earned Value Management Mastery, Project Scheduling Blueprint, Project Control Career Success Roadmap, Project Controls for Project Managers, and Applied AI in Project Controls.
Known for simplifying complex concepts and turning them into actionable learning, Shohreh continues to collaborate with leading industry experts to bring practical insights, current trends, and real-world guidance to the global project controls community.
To learn more about Shohreh, visit her profile on LinkedIn.
Claim Your Spot Now!
Please share the news about this masterclass with your connections