The time of sitting on the sidelines and waiting for others to take the lead in implementing new ideas and technologies has passed.

It’s time to be in forefront of the growth and show how as a project professional you can help your projects and organization soar to excellence.

It’s your time to lead the way in bridging the gaps and growing Project Controls.

To lead the way in Project Controls, you need to leverage from the lessons learned and experiences of others who have been on this path before you.

What if you could tap into the hard-earned lessons from a panel of top experts and leaders in Project Controls?

Imagine a specialized, cross-functional team of Project Controls leaders, who collectively bring over 150 years’ worth of experience, brought together to share their specific project problems and their lessons learned with you in a fun and engaging way!

What if you can partake in the discussions while having fun and learning?

It’s a session you cannot afford to miss!

The session will be conducted in a fun way through a truth and lie game, where you can participate in the discussion and be a lie detector!

Yes, a lie detector!

The panelists will each provide two short war stories from their past projects, each of which will include two truths and one lie in their mix of stories. One of the panelists, the Doubter, will question each panelist and provide challenges and objections in an effort to prove the stories to be lies while the panelists defend their stories.

You will get a chance to ask follow-up questions, engage in the conversation, and subsequently vote on whether the story is a truth or a lie.

Through this interactive panel discussion, you will not only have fun, but also learn how the problem projects were tackled in the best way possible.

We end the session by sharing the top 5 lessons learned on leading the way by each panelist based on their experience in project controls, digital transformation, and risk management.

We invite you to join us in this fun, engaging, and value packed webcast. Also, come armed with your lie detectors working.

LinkedIn
Facebook
Twitter
WhatsApp
Email

WARNING:

We have limited number of spots available on our webcast system and space will fill up fast, so register now to avoid missing out.

This live webcast will be packed with high quality content that can change your career for the better!

About Julie Owen

Julie Owen is an industry thought leader with more than 30 years of experience in project controls managing programs and delivering capital projects.  She is a published author and international speaker delivering presentations in fifteen countries and six continents.  

Julie is a Distinguished International Fellow of the International Cost Engineering Council, Fellow of the Guild of Project Controls and AACE International Fellow.

Julie works as Senior Executive Officer, Project Management Oversight for Los Angeles Metro.  She is a senior leader with proven ability to lead teams and deliver program and projects on-time and within budget.  She is helping manage the $160 billion over 50-year capital program to improve Los Angeles County transportation infrastructure.

To connect with Julie, please check her Linkedin profile.

Chris_Carson

About Chris Carson

Chris Carson is the Enterprise Director of Program & Project Controls & Vice President at ARCADIS U.S. and one of the instructors of Project Control Academy, teaching the Forensic Schedule Delay Analysis training.

He has over 40 years’ experience in Program/Construction Management, specializing in Program/Project Controls disciplines. His background includes educational, municipal, commercial, industrial, governmental, military, and medical projects, and other industries including facilities, infrastructure/transportation, water and wastewater treatment and utilities, and environmental projects. 

Mr. Carson is a recognized thought leader in industry associations including CMAA, AACE International, RICS, PMI, and the Guild of Project Controls. He has presented over 750 industry sessions, authored, or contributed to over 75 publications, and industry best practices, and received multiple awards from AACE International, PMI, and CMAA for his contributions to the industry.

Mr. Carson is a CMAA Certified Construction Manager (CCM), a PMI Project Management Professional (PMP), an AACE International Planning and Scheduling Professional (PSP), Decision and Risk Management Professional (DRMP), and Certified Estimating Professional (CEP).

About Gillian Smart

Gillian has 20+ years of experience in Project Controls in the Oil and Gas industry specifically. She was the Head of Projects Portfolio Information at Woodside Energy where her focus was on streamlining processes and systems and integrating with other parts of the business to ensure successful delivery of projects in the digital age. 

Starting her career with an engineering contractor, prior to joining an operator, she worked her way up through the ranks of various project control disciplines to the Head of Project Services role at BHP.  As a Project Services Manager in a owner company projects have included both Operated and Non-Operated, Greenfield and Brownfield and all phases of a project lifecycle from pre-development assessments, front end planning through execution and close out. 

She enjoys delivering strong business outcomes, coupled with creating a culture of care and supporting development of others. She also loves sharing her passion for Project Controls and developing it as a profession for others to follow in. As a lifelong learner, she is motivated by learning new things and loves the challenge of leadership in learning and evolving as a leader every day. 

To connect with Gillian, visit her LinkedIn profile.

About Roberto Orlandi

Over the past 25 years, Roberto has been engaged on projects distributed across all continents and a range of industries; from Major Infrastructure, to Oil & Gas and Information Technology.

Starting as a Structural Engineer, his passion quickly took him to Project Management and Project Controls, where he has served in a number of Regional and Global roles.

He is currently Microsoft’s Director of Project Governance & Knowledge Management. Previously, he covered the roles of Project Manager on Megaprojects, Regional Project Control Director, Project Control Talent Development Coordinator, Head of Finance Control in various General Contractor and Client organizations.

As a successful leader in Project Controls, he has always been passionate about the professional growth of his employees and partners. He believes in mentoring and empowering his teams, to create the next generation of leaders; and in collaborative synergies between companies and organizations, to raise the bar and achieve increasingly innovative solutions together.

Roberto is the recipient of many prestigious awards including “ExxonMobil-SABIC Project Delivery” (USA), “SNC-Lavalin Most Agile Project Controls Award” (RSA), “CBI-Kentz Joint Venture Recognition of Excellence” (AUS) and “FIAT Group Services Best Employee Award” (ITA).

To connect with Roberto, visit his LinkedIn profile.

About Shohreh Ghorbani

As the founder and director of Project Control Academy, the leading provider of comprehensive online training programs in Project Controls, Shohreh has served tens of thousands of professionals to take their project controls skills to the next level.

In April 2018, AACE International Source Magazine featured Shohreh as the “Woman in Project Controls” honoree.

With her impressive track record in teaching and years of hands-on experience on a wide range of project control technical areas in various industries, clients have acknowledged Shohreh as a passionate trainer who transfers the knowledge of project controls in a simple and understandable manner.

Shohreh is a licensed project management professional (PMP) recognized by Project Management Institute (PMI) and a professional member of the Association for Advancement of Cost Engineering (AACE International). Toastmasters International certified her as “Advanced Communicator Silver”. She holds a Master of Science in Industrial Engineering.

Meet Shohreh at Project Control Academy or connect with her on LinkedIn.

About John Hale

John Hale has over 30 years of direct experience in Project Management, Project Controls, Project Risk Management, Contract Management and Contract Risk Management in businesses as diverse as telecommunications, aerospace, NASA, defense contracting, and most notably on large EPC projects, such as power generation facilities, refineries, pipelines, LNG, GTL and chemical plants. 

John has performed over 50 Economic or integrated Project Risk Assessments, which can include Contract Risk. He is a recognized leader in the area of Quantitative Schedule Risk Analysis (QSRA), having conducted or supervised over 130 large EPC, infrastructure or logistics project QSRA’s on every continent and in over 30 countries.

Mr. Hale has a BA from California State University, Chico and an MBA from Texas A&M University in College Station, TX and attended the AMP at the Thunderbird School of Global Management in Glendale, AZ.  He has held a PMP certification for over 20 years, been a contributor or author to publications from AACE, a presenter or panelist at numerous forums and conferences, and is the Regional Director for PRMIA in Houston.  

To connect with John Hale, please check his Linkedin profile.

Claim Your Spot Now!

Please share the news about this masterclass with your connections

LinkedIn
Facebook
Twitter
WhatsApp
Email

Copyright 2012-Present Project Control Academy – All Rights Reserved

>